Safest payment terms for machinery: LC or staged payments?

Staged payments tied to milestones and inspection protect you best. A letter of credit adds bank control over documents but does not check the machine itself.

· 3 min read · Creston & Co

The safest structure links each payment to something you can verify: an advance against a bank guarantee, a payment after a passed factory trial, and the balance against shipping documents. A letter of credit can carry that balance, but it checks paper, not the machine.

Common terms are covered in payment terms for machinery orders. This article looks at which give you the most protection.

The principle is simple. At each stage, the supplier should have earned the money it holds, and you should hold something of value until the machine is proven. That might be cash retained, a bank guarantee or control of the shipping documents.

Staged payments

A staged plan splits the price into milestones. A typical structure has three or four stages:

  • An advance on order, which funds design and materials and is best protected by an advance payment bank guarantee from the supplier's bank.
  • A payment after the factory acceptance test, released only when the machine passes the agreed trial.
  • A payment against shipping documents, which proves the machine has been dispatched.
  • A retention after installation or acceptance at your site, held back until the machine performs.

Letters of credit

Under a letter of credit, your bank promises to pay the supplier when it presents documents that comply with the credit. Most credits follow the ICC rules known as UCP 600.

This protects you from paying before shipment, and it reassures the supplier. But banks examine documents only. If the credit asks just for an invoice and bill of lading, a wrong or faulty machine can still be paid for.

Make the credit work for you. Require a third-party inspection certificate, a signed factory test report or a certificate of conformity among the documents. Set a latest shipment date that matches the contract. Keep the wording precise, because vague terms lead to disputes over discrepancies.

Putting it together

Combine the methods. Many buyers pay an advance by transfer against a guarantee, then use a letter of credit for the shipment payment, with an inspection certificate as a required document. A retention covers installation, as explained in retention and performance guarantees.

Write the milestones and their evidence into the contract. For each payment, name the document that triggers it, who signs it and the number of days to pay. Disputes usually start where a milestone was described loosely, such as "machine ready".

Avoid paying most of the price before you have seen the machine run. Fully open terms put all the risk on you. Bank fees and guarantee costs vary by bank and country, so ask your bank before you set the structure.

Next step

We witness factory trials and issue inspection reports that can serve as a payment trigger or a credit document. To structure this for your order, book a free sourcing review.